



사진 170개
위치
Greeley, CO
Greeley, CO
사용량
411,187 mi
411,187 mi
일련 번호
1FV6HFBA2YHB97088
1FV6HFBA2YHB97088
Loading...
이 로트는 IronClad 보증에 의해 보호됩니다.
이 로트는 적격 검사관이 철저히 검사했으므로 믿고 구매할 수 있습니다.
ID 번호
#15633586
경매장 내 보유
아니요
기능
Cummins B5.9 6 Cylinder 5.9 L Diesel 235 hp Engine, 2002 US EPA Label, 8367.3 Engine hrs, Air Conditioner, Cruise Control, Manual Transmission, 12000 lb Front Axle, 21000 lb Rears, 33000 lb GVWR, Aluminum Wheels, 11R22.5, Spring Suspension, 187 in Wheelbase, PTO, Interpipe 15 ft 7 in Body, ( 4 ) Oil Tanks, ( 9 ) Hose Reels, Metered Nozzles, Grease Barrel, Filter Drain Tray, Oil Recovery System, Hydraulic Hose Reel, Boss BA435 35 cfm Hydraulic Air Compressor, Air Hose Reel
참고
***Please see seller supplied service repair information attached in the documentation section below.*** <br><br>***Engine rebuilt less than 10,000 miles ago ***































Serial Number / VIN
1FV6HFBA2YHB97088
Frame Stamp Serial Number/VIN Photo
Hour Meter / Odometer
411187 mi-No guarantees made as to actual hours/miles/kilometers; the inspection report reflects what can be visually observed.
Motor Vehicle Safety Standards Label
Yes
Paint
Sheet Metal (fiberglass) Condition
Steps/Ladders
Hand Rails
Glass
Exterior Lights
Operational
Steer Axle
Rear Axle
















Emissions Information
2002 US EPA Label
Emission Label
A/C Compressor
Operational
Blow-by (subjective visual observation)
No noticeable vapor or pressure
Starter
Operational
Air Compressor
Operational
Fuel System
Operational
Exhaust System
Radiator
Oil Leaks
No dripping leaks
Fuel Leaks
No dripping leaks
Cooling System Leaks
No dripping leaks
Engine - Left Side
Engine - Right Side
Limited Function Check
The engine started and ran.






















Engine Hours
8367.3 Engine hrs
Mirrors
Window Controls
Both Manual
Seats/armrests
Seat Belts
Operational
Steering Control
Horn
Electric horn operational
Oil Pressure
The gauge registers in the operating range.
Warning Lights
Operational
Gauges
Operational
Gear Selector
Brake Control
Operational
Clutch
Engages
PTO Control
Operational
Air Conditioner
Operational
Heater
Operational
Limited Function Check
The main components are in place and operational as noted.































Steering Components
Steer Axle
Transmission
Operational
Power Take Off
Operational
PTO Pump
Operational
Frame Condition
Rear Drive Axle
Limited Function Check
The drivetrain was operational without a load.
Suspension Springs/Hangers
Suspension Bushings
Left Steer Tire
Left Rear Drive Tires
Right Rear Drive Tires
Right Steer Tire
Wheel Condition
Wheel Studs
Hydraulic Tank
Limited Function Check - Brakes
The service brakes are operational, The park brake is operational.






































































Bed Body
Air Compressor
Operational
Tool/Storage Boxes
Product Tanks
1 Fuel Tanks, 6 Product Tanks
Hose Reels
9 Hose Reels, Not operationally checked
Product Pumps
Not operationally checked
Hoses
Grease Barrels
Not operationally checked
Oil Sample Analysis
| engine | |
|---|---|
| date of analysis | Aug 05, 2026 |
| Silicon | 93.18 PPM |
| Tin | 4.22 PPM |
| Silver | 0 PPM |
| Aluminum | 3.43 PPM |
| Chromium | 8.55 PPM |
| Lead | 4.33 PPM |
| Copper | 26.5 PPM |
| Nickel | 0.72 PPM |
| Iron | 114.07 PPM |
| Glycol | NEG |
| Water | NEG |
| Fuel | <5% |
Ritchie Bros. 종합 도어 투 물류 및 배송 솔루션으로 장비를 원하는 장소로 안전하게 배송하세요. Ritchie Bros.는 국경, 대륙, 바다를 넘어 귀하의 장비가 빠르고 효율적으로 도착할 수 있도록, 운송의 모든 과정을 포함한 통합 서비스를 제공합니다.
자세한 장비 정보는 범위가 제한되어 있으며, Ritchie Bros. Auctioneers에서는 본 문서에 명시된 항목 이외의 장비 구성요소나 측면에 대해서는 검사하지 않았습니다. 명시적으로 언급하지 않는 한, 당사는 장비 또는 그 구성요소와 관련하여 명시적으로나 묵시적으로 어떠한 진술이나 보증을 제공하지 않습니다. 여기에는 기능, 해당 당국이나 규제 기관의 안전 표준 또는 요구 사항의 준수, 특정 용도 적합성, 상업성 등과 관련된 진술 또는 보증을 포함하되 이에 국한되지 않습니다. 입찰하기 전 장비의 상세한 검사를 실시하도록 강력히 권장합니다.
장비는 짐을 실은 상태에서 테스트되지 않았으며 사용 가능한 모든 기어에서 작동되지 않았습니다. 당사는 장비가 제조업체 사양에 따라 작동하는지 여부에 대하여 진술하거나 보증하지 않습니다. 여기에 명시적으로 포함된 항목 이외에 기능성 측면과 관련된 검사는 수행되지 않았습니다. 개별적인 차량 하부 구성요소에 대해 선별된 사진만 제공되었으며, 제공된 사진은 차량 하부의 전체적인 상태를 나타내지 않을 수 있습니다.
치수는 추정치로만 제공됩니다. 실제 적재 치수는 트럭/트레일러 높이 및 적재된 장비 구성/위치에 따라 달라질 수 있습니다. 안전한 운송을 위해 경매 현장에서 방출하기 전 적재 치수를 측정하는 것은 구매자의 책임입니다. 모든 치수는 구매자가 확인해야 합니다. 운송 시 이 치수에 의존해서는 안 됩니다.